Woolworths Adelaide Regional Distribution Centre Expansion
Highlights
- 599 Main North Rd, Gepps Cross, SA
- Hutchinson Builders, VIC
- $57.0M
- 19,600sqm across three warehouses | 30,800sqm hardstand
- 16.7kg/sqm structural steel design
- 150-180mm 30kg/m3 BOSFA Dramix 3D fibre slab on ground
Project Details
We were engaged to embrace our creative mindset and add significant value to our client’s bid for the D&C project. We delivered in spades with around $2.2M of structural value add to their bid. We identified and delivered savings in the order of 390 tonnes of structural steelwork (reducing the original engineer’s design down from their 35.0kg/sqm to our 16.7kg/sqm) and 1,500 cum of reinforced concrete.
Our scope included a 10,800sqm ambient warehouse extension, 5,150sqm temperature-controlled warehouse extension, 3,650sqm new returns transfer facility building and 30,800sqm of new external hardstand.












Tomkins

Deluca

Hutchinson Builders

CHP Projects

TM Insight

Hansen Yunken

Badge

Douglas

FKG Group

AC Rigging & Steel

Hilton Foods

ADCO

Woolworths Group

Vaughan Constructions

Niclin