Stockland Yatala QLD

Highlights

  • Address: 77 Darlington Drive, Yatala, Queensland
  • Developer: Stockland
  • Tenant: Speculative
  • Builder: CIP Constructions
  • Warehouse:8,500m²
  • Awning:1,500m²
  • Warehouse 2:9,180m²
  • Awning 2:1,680m²
  • Offices: 1,400m²
  • Designed: 2023
  • Built: 2024
  • Steelwork Rate: 13.25kg/m²
  • Purlin/Girt Rate: 7.1kg/m²

Structural Features

This project consists of four tenancies across two warehouses with a 200sqm 2-storey composite floor office for each tenancy. The warehouses consisted of a traditional steel portal frame & metal clad frame, founding on high level foundations & internal fibre slabs. Warehouse 1 consisted of 12m end wall awnings & warehouse 2 had 12m awning over the building access docks. The biggest challenge was the building line retaining of up to 3.2m, covering approximately 220 linear metres of the warehouse.