Stockland Yatala QLD
Highlights
- Address: 77 Darlington Drive, Yatala, Queensland
- Developer: Stockland
- Tenant: Speculative
- Builder: CIP Constructions
- Warehouse:8,500m²
- Awning:1,500m²
- Warehouse 2:9,180m²
- Awning 2:1,680m²
- Offices: 1,400m²
- Designed: 2023
- Built: 2024
- Steelwork Rate: 13.25kg/m²
- Purlin/Girt Rate: 7.1kg/m²
Structural Features
This project consists of four tenancies across two warehouses with a 200sqm 2-storey composite floor office for each tenancy. The warehouses consisted of a traditional steel portal frame & metal clad frame, founding on high level foundations & internal fibre slabs. Warehouse 1 consisted of 12m end wall awnings & warehouse 2 had 12m awning over the building access docks. The biggest challenge was the building line retaining of up to 3.2m, covering approximately 220 linear metres of the warehouse.